Start of baseline measurement for the application of EHP system (Oct. - Dec. 2012)
A preliminary survey of the sites for EHP introduction was conducted between 28 October and 11 November, in order to determine the number and location of the measurement tools to be installed and to develop diagrams for installation. From 1 to 15 December, measurement tools were installed according to the diagram, and then explanation/instruction on measurement and data collection was given to TERI and the sites. Baseline measurement and data collection for the application of EHP system were duly started.