Outline
TOPProject OutlineFramework Activities/Meetings Research Products Japanese
 
Activities/Meetings
 
Start of baseline measurement for the application of GHP system
 
A preliminary survey of the sites for GHP introduction was conducted from 31 August to 10 September, in order to determine the number and location of the measurement tools to be installed and to develop a diagram for installation. From 25 September to 7 October, measurement tools were installed according to the diagram, and then explanation/instruction on measurement and data collection was given to TERI and the sites. Baseline measurement and data collection for the application of GHP system were duly started.