GHP systems were installed and operation started (8 to 27 February 2013)
 
GHP systems were installed at the sites for pilot projects in India from 8 to 27 February. The installation work included foundation, piping and electric work and was carried out mainly by TERI and SMEs, with the support of supervisors from a Japanese GHP maker. A test run to check the system performance was performed soon after the installation, and the operation of the system started at the end of February. Moreover, measurements are now being taken to evaluate the effect of introducing GHP system and data is being collected.